Back to Projects
Al-Nour Hospital HVAC
Engineering

Al-Nour Hospital HVAC

Precision HVAC design and commissioning for a 400-bed hospital.

Location

Omdurman, Sudan

Year

2023

Client

Al-Nour Medical Group

Duration

12 months

Challenge

Medical-grade air quality and infection control

Solution

Laminar flow operating theatres and isolation rooms

Results

400 beds

Laminar flow theatres

Negative pressure isolation

HTM 03-01 compliant